Case Study From Renewal Logistics:
Fast Ramp Up Saves Relationship with Top Warehouse Club Retailer
A top 5 brand that sells most of the apparel goods in a top 2 major big box wholesaler had 300,000 jeans contaminated with mold.
The jeans were selling for $40/pair. The order had to be decontaminated and ready to ship within 2 weeks, or this brand would lose the wholesaler account, which could have been up to $100M in lost sales per year.
The brand had no good solution as no one in the world was able to accommodate this volume and complexity with such little lead time. They found Renewal Logistics on the internet and asked for our help.
We secured the project Monday, by Wednesday we were producing 27,000 units per day with 2 shifts of 200 workers. There were numerous opportunities for compliance failures (retrimming, repacking multi sku case packs) and yet there were zero chargebacks. The wholesaler was 100% satisfied.
We were able to save 99.9% , finished 2 days early, the brand lost no time and no sales.
$20M
Profit Opportunity
$100M
Revenue at Risk
12
Day Turnaround
300,000
Units Saved
Looking For More?
If you ever want to chat with our existing clients, many of them we have NDAs with, so I can’t share their names on the website or in our newsletter, but I assure you, you’ve purchased product from them, and if you want to verify our consistency, accuracy, and ability to handle complexity with ease, they’ll be happy to talk to you.